As the sty is the first thing to be provided, let this be built of any rough materials, say six feet square, with a raided floor, sloping in a trilling d...
http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
https://www.riss.kr/link?id=O125633391
1861년
eng
학술저널
PHP / Magazines / Advertisement
0
상세조회0
다운로드다국어 초록 (Multilingual Abstract)
As the sty is the first thing to be provided, let this be built of any rough materials, say six feet square, with a raided floor, sloping in a trilling d...
As the sty is the first thing to be provided, let this be built of any rough materials, say six feet square, with a raided floor, sloping in a trilling degree towards the corner next the opening. The roof must be of tiles or slats; the whole, sides and front, weather tight. The opening should be about two feet wide, but no door. Outside this, rail a space off as large as you can afford...