This paper presents a asymmetry fault current reduction scheme with recloser operation during transient period. The principle of asymmetry current nature is reviewed and asymmetry components reduction with recloser operation is explained. Throughout t...
This paper presents a asymmetry fault current reduction scheme with recloser operation during transient period. The principle of asymmetry current nature is reviewed and asymmetry components reduction with recloser operation is explained. Throughout the simulation, results verifies the proposed scheme for recloser operation and its effectiveness.