손기상 한국산업안전학회 1987 한국안전학회지 Vol.2 No.1
Currently Safety accidents have been raised & more concerned despite that Government has emphasized on preventing accidents in construction area of Korea. An accident is due to several causes of it, thus this the study, as the above, will specify the methodology to establish more effective safety prevention plan, itself, compared to most studies being based on a case, pecially for the projects under Far-East District, Corps of Engineers, USA. Additionally, this study will be limitted for performance method and the projects will not be classified with the same sorts as domestic ones are.
손기상,강수헌,양학수 서울産業大學校 2005 논문집 Vol.54 No.1
소규모 사업장은 자체적으로 안전보건 개선을 도모하거나 자율적인 안전보건관리활동을 추진항 수 있는 기술이나 능력이 없는 사업장이라 할 수 있다. 이러한 소규모 사업장에 대해서는 정부에서 소규모 사업장에 적합한 정책을 마련하여 적용할 필요성이 있다. 정부의 정책적 배려가 절대적으로 필요하다고 사료된다. 소규모 사업장이 핑필요로 하는 산재예방 정책은 소규모 사업장의 안전보건을 지도·지원할 수 있는 조직제제 구축에 관련된 정책, 소규모 사업장 안전보건관리 작업환경과 기계·설비 등에 대한 개선 조치 관련 정책, 작업 안전보건 확보를 위한 관히통제 및 촉진 관현 정책등을 소규모 사업장이 필요로 하는산재예방 정책으로 들 수 있다. 소규모 사업장에 대한 교육지원이 있었다 할지라도 인력의 빈번한 교체로 인한 같은 지원이 반복되어야 되는 악순환이 지속될 수 있고 소규모 사업장의 분포도에 따른 감독업무시행의 정착으로 전 사업장의 균등한 예방강도 정착이 될 수 있다. 또한 컨설턴트 조력제에 의한 예방차원의 감독업무 정착을 기할 수 있으며 재해다발 사업장 위주의 사후처리 감독을 지양하고 예방차원의 업무가 정착될 수 있다. 그리고 TARGET INDUSTRY 제도에 의한 사전예방차원의 노둥부 감독 선행제도 수립이 필요하며 본 연구결과물이 소규모 사업장 또는 정부에서 활용되는 경우, 소규모 사업장에는 효율적인 안전보건관리체계가 구축·운영될 수 있을 것이고, 소규모 사업장의 산재예방정책이 근본적으로 개선될 수 있을것으로 분석된다. 본 연구는 소규모 사업장에 적합한 안전보건관리시스템(OSHMS)을 구성·운영할 수 있으며, 소규모 사업장의 안전보건관리시스템의 각 구성요소에 대응되는 효율적인 산재예방 정책체계를 구성·운영할 수 있을 것으로 사료된다.
안전난간유형에 따른 작업자 안전의 상관관계에 대한 실험적 연구
손기상 한국산업안전학회 2001 한국안전학회지 Vol.16 No.2
Work stress and health are very important factors related to workers' condition and work safety. Author has conducted a couple of tests to check up three people's pulses before they work, during their work, for three types of safety guard in construction site. Work type, age, weight, sex, experience year, ambient temperature were recorded as variables in this study. These are checked and asked by the author directly, before their pulse check. Also, workers' pulses were measured at height H-0 and H-9.0m to understand psychological the of psychological nervousness degree. POLAR protrainer NVTM HRM system(wrist recorder and sensor) was used for the site test. There are three(3) different types of construction safety guard which have been used for this study. They are usually or frequently used and found in the site. Four different ranges of age groups(20's, 30's 40's, 50's) carpenters are assigned to the test sites with wearing pulse recorder and sensor respectively. All three types of safety guards have the same height 90㎝, even though they are different types. On top of five(5) stories tublar framed scaffolding is fabricated, similar to the one in site, where those safety guards are installed. The older(=more experienced) the workers are, the more stable they are, it is shown. Also, It is verified that visually uncomfortable rail type can cause workers to psychologically be unstable.
비계지지브라켓 유형별 구조기준 설정에 관한 실험적 연구
손기상,갈원모 한국산업안전학회 1995 한국안전학회지 Vol.10 No.4
It is only three(3) years since we applied brackets for scaffolding in the construction area. Unfortunately, there is no structural criteria on how to install those in the site so far, despite the fact that those brackets have been applied into the site by the firms already. It is shown that resistant capacity of each bracket type has been investigated, analyzed from this experimental study. Accident-concerning data on construction site analyzed by the Ministry of Labor, show temporary structure involves 18.6% of the total industrial accident, which the accidents from scafold-supporting brackets have rate of 42.5% of the ones occurred from the temporary structures. There are two main aspects to be observed : one is how much resistant capacity the brackets have themselves, the other is how exactly to install those without eccentricity. But practically, nobody does check of this bolt-installing conditions in the site and no check of tightening level of nut because there is no available tool to check torque amount for this kind of nut. We just have to rely on scaffolders experience of this tightening. This experiment involves just this variable of tigtness at site. Eventually this insufficient tightness causes to collapse those scaffolding structures. The bracket might have less the one than its original capacity due to this insufficient tightness. Three(3) times of PIVOT tests show that fractured condition of two(2) row brackets has occurred mostly at lower bolt due to shear force. Therefore, tightness of bracket-installing bolt, tensile strength of the bolt, shear strength of the bolt, loading condition with equal two point or inequal two point loads, are mainly investigated as variables in this study.