유남재,박병수,정길수,이병곤 江原大學校 産業技術硏究所 2001 産業技術硏究 Vol.21 No.A
This paper is experimental results of investigating the efficiency of horizontal vacuum drainage system. Effects of size and shape of drain on horizontal vacuum drainage were studied. Model tests in the laboratory with soft marine clay were carried out with drain pipe of having three different diameters and PBD (Plastic Board Drain) of strip shape so that consolidation settlement of soft clay due to applied vacuum pressure, amount of discharge, around settlement and distributions of pore pressure and undrained shear strength were measured during testing. From results of model test, amount of discharge due to vacuum pressure was increased with the diameter of pipe drain whereas the drain efficiency of pipe in per unit area of drain surface was decreased with diameter of pipe. The rate of discharge per unit time was reduced verb fast with diameter of pipe. Settlement of ground surface with time was increased with diameter of pipe as a result of increase of discharge to drain pipe.
유남재(Yoo Nam Jae),박병수(Park Byung Soo),정길수(Jeong Gil Soo),이병곤(Lee Byung Kon) 강원대학교 산업기술연구소 2001 産業技術硏究 Vol.21 No.1
This paper is experimental results of investigating the efficiency of horizontal vacuum drainage system. Effects of size and shape of drain on horizontal vacuum drainage were studied. Model tests in the laboratory with soft marine clay were carried out with drain pipe of having three different diameters and PBD (Plastic Board Drain) of strip shape so that consolidation settlement of soft clay due to applied vacuum pressure, amount of discharge, ground settlement and distributions of pore pressure and undrained shear strength were measured during testing. From results of model test, amount of discharge due to vacuum pressure was increased with the diameter of pipe drain whereas the drain efficiency of pipe in per unit area of drain surface was decreased with diameter of pipe. The rate of discharge per unit time was reduced very fast with diameter of pipe. Settlement of ground surface with time was increased with diameter of pipe as a result of increase of discharge to drain pipe.