http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
토석류 방재구조물 성능 검토 수치해석 - Case study: 부산 백양산
정석일 ( Seokil Jeong ),송창근 ( Chag Geun Song ),김홍택 ( Hong Taek Kim ),이승오 ( Seung Oh Lee ) 한국안전학회(구 한국산업안전학회) 2018 한국안전학회지 Vol.33 No.4
The number of landslides has increased since the 2000s due to the increased frequency of heavy rainfall caused by abnormal weather. A variety of debris flow prevention facilities have been installed as a countermeasure against this problem. However, it is not easy to evaluate the efficiency of debris flow prevention structures except for the structures with constant volume such as the erosion dam, because the other structures are limited to be reproduced in simulation program for debris flow. Therefore, the methods by which the debris flow prevention structures were modeled were proposed, and the efficiency of four prevention structures installed in Baekyang Mt. in Busan was evaluated with UDS, which accuracy had been verified, using these methods. The initial amount of debris flow was determined based on landslide which occurred in 2014, and specifications of the complex retaining walls around the settlements were measured and applied modeling for terrain. The numerical results showed that the efficiency of debris flow prevention structures could be quantitatively presented. Among the debris flow prevention structures installed in Baekyang Mt., prevention structure of barrier type for debris flow was the most efficiency and debris flow prevention device was the lowest efficiency when the only depth of debris was evaluated. It seems that this study is meaningful to propose the methods which were used to model the debris flow prevention structures that could not be reproduced in most 2D debris flow numerical analysis programs. If precise verification of the presented methods is carried out, it will be possible to provide clear criteria for the efficiency evaluation method of disaster prevention structures.