http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Zhenqiang Bao,Xiaoqing Ren,Yulu Yang,Junwu Zhu,Cheng Wang,Richao Yin 보안공학연구지원센터 2015 International Journal of Hybrid Information Techno Vol.8 No.7
Since that a job usually contains several working procedures in actual production, and it’s hard to optimize the flexible collaborative planning, the flexible lot splitting and scheduling of the job simultaneously in batch production mode, a model for multi-objective integration of flexible collaborative planning and fuzzy lot-splitting scheduling is established. We take four performance indicators below which are the most common as standards to optimize the model: average delivery satisfaction, fuzzy total cost, fuzzy completion time and average credibility of job tardiness, and then a multi-objective algorithm based on the Pareto optimal is established. In this algorithm, we design the integrated coding scheme, which include collaboration chromosome, lot-splitting chromosome and scheduling chromosome, meanwhile the Pareto optimal scheme is designed. Finally, the efficiency of the model and algorithm is proved by the simulation.