Management Plan for Liquid Radioactive Waste in the Waste Treatment Facility
Mugap Shin,Jungsu Park,Dongbin Shon 한국방사성폐기물학회 2022 한국방사성폐기물학회 학술논문요약집 Vol.20 No.1
Starting with the permanent shutdown of Kori Unit 1, the first waste treatment facility in Korea will be built on the Kori site. In this facility, major process such as decontamination, cutting, radiation measurement and volume reduction of decommissioning waste are performed, and radioactive liquid waste is generated by the waste treatment process and personnel decontamination. The generated liquid waste is finally discharged to the sea through radioactive monitoring system after sufficient treatment to meet the standard radiological effluent control. Whereas the treated liquid waste is additionally diluted through the circulation water discharge conduit and discharged to the sea in the operating nuclear power plants, there is no circulation water in the waste treatment facility. Therefore, a new discharging method for dilution after treatment should be considered. In this paper, the treatment concept and discharge method of radioactive liquid waste system in waste treatment facility are reviewed.
Arrangement of Subsequent Disposal Facilities in the Complex Disposal Facility
DongBin Shon,HyeongJoon Yun,MuGap Shin 한국방사성폐기물학회 2022 한국방사성폐기물학회 학술논문요약집 Vol.20 No.1
Currently, the Gyeongju disposal facility is planned to be operated as a complex disposal facility with three types: cave disposal, surface disposal, and landfill disposal. Approximate method and arrangement have been decided up to the 1st, 2nd, and 3rd stage disposal facilities, but the optimal method for the arrangement of the entire complex disposal facility has not been established. When establishing the subsequent disposal facility arrangement plan, the generation prospect and disposal capacity setting plan for each level of radioactive waste was established, and the disposal capacity of the subsequent disposal facility, the disposal facility method, etc. were reviewed and reflected. Among the items for deriving an efficient management plan, KEPCO E&C is going to first derive a site arrangement plan for each disposal facility of 800,000 drums of radioactive waste, and has drawn up a plan for each scenario through collaboration with other organizations. When establishing the subsequent disposal facility arrangement plan, the generation prospect and disposal capacity setting plan for each level of radioactive waste was established, and the disposal capacity of the subsequent disposal facility, the disposal facility method, etc. were reviewed and reflected.