정용찬,구교진,현창택 대한건축학회 2004 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.24 No.1
Recently, as the building height goes up, the construction period of finishing materials has become one of the most important key issues in the tall building construction. For the reason, one of the vertical transportation equipment, the lift car is more important than before. So. this study reviews properties and problems of the lift car planning in the tall building construction field, and systemizes the process of how many lift cars are suitable in the field. Also, this study suggests the lift car selecting model to calculate exact figures of finishing materials and workers.
박성철,구교진,현창택 대한건축학회 2004 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.24 No.1
The purpose of this study was to predict the subcontract fair cost of general construction by using the index. The index is caculated by data of Price Reserch Institute and CAK(Construction Association of Korea) is used in Time Series Anaysis. Subcontract fair cost is estimated by the index which predicted by Time Series Anaysis. and then, Regerssion Analysis performed in order to consider factor impact on cost. Throughout his study, we will be able to contribute to protect dishonor of subcontractor along with improvement of accuracy of subcontract cost budget in general construction
인치성,구교진,현창택 대한건축학회 2004 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.24 No.1
The purpose on this study was to compare and analyze the VE implementation tendency inside and outside of the country, development of methodology in function definition and proposal for computerized FAST diagram creation by suggested VE concept module. To prevent VE/M Methodology application from the non-efficiency application, the Supports and Detachable Units in SAR Methodology which used in multi-housing design, SVM(Systematic Value Methodology) diagram of the Shaozhi(2002) and Classification of ISO 1994 were applied to this actual practice as the FDM(Function Definition Module). The Improvement of this function definition method, computerized FAST diagram creation, and applying the VE Concept module is to be used to create much ideas for enhancement in construction field.
공공건설공사의 사업단계별 관리업무 순위 결정 : 책임감리와 건설사업관리를 중심으로
김양현,구교진,현창택 대한건축학회 2004 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.24 No.1
As the construction projects have become more complicated and larger in scale, management have been more important in construction. But owner in public sector usually commits construction supervision to the private management firms. So there is a big problem that Supervision doesn't control cost, time, contract and so on. The purpose of this study is to select the priority decision of construction management tasks according to project phases, especially in public sector. This study may help owner when owner contracts management service with private management firms.
국내 공공부문 설계시공일괄입찰방식의 낙찰자 선정방법 개선에 관한 연구
김만철,서용철,구교진,현창택 대한건축학회 2003 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.23 No.1
Design-Build is considered as the project delivery system to manage construction process more efficiently than design-bid-build. So Korea government has encouraged Design-Build in public sector. But single selection method of weighted criteria doesn't provide the greatest value to owner. Therefore, there is a need to improve selection method to meet owner's needs and project characteristics. This study proposes four types of selection method. Each of selection method is focused on price, qualification, time. The use of these selection methods enable owner to provide the greatest value.
건설VE에서의 준비단계와 분석단계 연계방안에 관한 연구
손석구,현창택,구교진 대한건축학회 2004 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.24 No.1
Value Engineering(VE) is in force for strengthening the competitiveness in internal construction industry. But, although there are systematic, technical efforts, VE is recognized only a method of cost saving in internal construction industry. Each phase of VE has not been connected organically and cut. It has focused only cost saving in target selection phase and function definition has been performed by original functions that target has. This study suggests the connection process between a target selection of preparation phase and a function definition of analysis phase, and reflects needs of clients and users and project characters in the target selection. This study suggests a method of an effective function definition
이정희,장홍진,구교진,김옥규,현창택,김양현 대한건축학회 2004 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.24 No.1
Since, korean government introduced Construction Management system by the law in 1997, only a few public construction projects have been adopted the system Nevertheless there are many laws which are related in public construction projects, Construction Management is positively carried out by non-government. About the activation plan of Construction Management questionnaire was inquired by experts in construction. The purpose of this study is to give a solution by finding out the problem of the laws, reconstructions remodelings.
공공 건설공사 중 부도에 따른 공사지연 방지 방안 : Focused on Apartment Houses
김백용,조영준,구교진,현창택 대한건축학회 2004 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.24 No.1
The purpose of this study was to reduce the factor of construction delay in the owner's aspect by analyzing the actual condition of field supervision positively such as construction delay sample and process at the distressed company's construction site. As we analyze the examples of construction delay and reopening into various types, to minimize construction delay after the dishonor of a contractor we propose "Cooperation and reliance fixing between the contract parties through the improvement of order method, Contracting system and Construction management system".
이승훈,서용칠,구교진,현창택 대한건축학회 2003 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.23 No.1
The purpose of this study is to propose an efficient design-VE job plan and applicable methods in each phase of design process. This is for more effective and practical use of VE in design phase. This study focuses on differences of the VE target selection phase and function analysis phase in each phase of design process. In the phase of preliminary design, conceptual sketch, size, use, or major spaces of project are selected for VE target and function assessment step is skipped because present cost and function cost cannot be produced easily in early in early phase of design. At the end of preliminary design phase, function review phase is added which consists of function satisfactory indices review step and unsatisfactory function removal step.
지성민,서용칠,구교진,현창택 대한건축학회 2003 대한건축학회 학술발표대회 논문집 - 계획계/구조계 Vol.23 No.2
In terms of the Safety, a risk of accident in construction industry is the most dangerous thing in any other industries. So, there have been many studies to improve the safety performance of construction projects. But, the most of them were dealt with controls in the job site and the contractor. For these reasons, the purpose of this study(Construction Safety Management) is two-part. : One is showing the basic items composed of prequalification in Construction Safety Management, and the other is improving the selection method to meet the owner's needs including a Contractor's Safety Management Performance.