http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
김익희(Kim Ick Hee),윤동희(Yoon Dong Hee),홍천희(Hong Cheon Hi) 한국철도학회 2011 한국철도학회 학술발표대회논문집 Vol.2011 No.5
The railroad freight transport has great merits that can transport mass and specific items(dangerous goods), but it takes a long time because of low accessibility to the logistics facility and the complex process of loading freight in middle station. This paper analyzed volumes and characters of each railroad freight item, and was carried out the effect of applying E&S system to Gyeongbu line containers to find the method of reducing transport time and effective container transportation. As a result of Cost-Effectiveness analysis, the block train(B/T) is reducing transport time more about 1~2 hours. The road congestion cost is saving about 2.2 billion won. And due to skipping work of organizing train, personnel and equipment expenses savings expected about 9 billion won. It is expected that the E&S system enhances the container transport service and has an effect positive influence on making a efficient method of transport. But It is necessary to estimate pre-feasibility of applying E&S system that the standard of estimating cost and benefit is required further examination.