RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • 친환경 기능성 무기질계와 탄성재를 이용한 내진보수ㆍ보강공법에 관한 연구방안

        백종명(Baek Jong-Myeong),김근수(Kim Keun-Su),홍종헌(Hong Jong-Hun),김한배(Kim Han-Bae) 한국철도학회 2009 한국철도학회 학술발표대회논문집 Vol.2009 No.11월

        As the growing concern about environment and earthquake for the concrete structure, many seismic rehabilitation and retrofitting methods have recently been studied but they are not coping enough with the changes of structure, specificly various problems have been found in seismic rehabilitation method - both in exposure or non exposure - when they are implemented to the underground structure, utility conduit, water supply facilities, underground wall, parking lot, road pavement, and elevated structure etc. This study is about the seismic rehabilitation method using environmentally friendly functional inorganic mortar and resilient material, and it is effectively retrofitted seismic performance as it reinforces not only physical strength, but also flexural and bond strength from the resilient material, and it has been analyzed and evaluated when the environmentally friendly functional inorganic mortar and the resilient material are applied so as to countermeasure the effect of earthquake and viable problems and approved for possibility of various applications and wide use.

      • 도시철도 친환경 지하터널 배수형식의 효율적인 유지관리 방안 검토

        백종명(Baek Jong-Myeong),홍종헌(Hong Jong-Hun),김한배(Kim Han-Bae) 한국철도학회 2010 한국철도학회 학술발표대회논문집 Vol.2010 No.7

        Excepting tunnel of dorimstream - ccachimountain station section, the subway line No.2th section was build using ASSM and NATM methods because of soil pressure and land condition. The way of dealing underground water was selected without sufficient preconsideration of geographical features, ground condition, influence of lowing underground water, and long-term cost of running maintenance so that the form of undrained tunnel was build having decreased construction characteristics and technically improper elements. The form of partial drainage is very difficult to manage structures of tunnel, because water leakage, water pressure causing cracks of lining concretes and scaling are constantly happened. so partial drainage suggest that setting reinforced Anchor Bolt to prevent buoyancy and should increase center drainage way up to height of railroad. Partial drainage suggest that holey pipe(ø350mm) manhole, drainage checking pipe manhole are should be regularly dredged , when changing roadbed(gravel→concrete) drainage checking pipe manhole should be build and setting a limitation of entering underground water's quantities. Beside drainage degree in changed section of structures causing instability of structures is continuous degree. so if efficient drainage way and the patterns of flaws, problems are considered in survey, it will be expected to have a advantage condition in maintenance part. 서울지하철 1~4호선 구간에서 부분적으로 도시터널공법을 채택하여 건설한 노선은 2~4호선으로서, 2호선 구간은 2기 지하철 건설시 시공된 신정기지 인입선 도림천~까치산역 구간 터널을 제외하고는 전체가 재래식 공법(ASSM)을 3~4호선 터널은 지형적인 여건 및 토압의 영향에 따라서 ASSM공법과 NATM공법을 병행하여 건설하였으며, 지하수 처리 형식은 지반조건과 지형적인 조건, 지하수위 저하에 의한 영향, 장기적인 운전 유지비 등을 감안하여 배수 및 비배수 형식을 적용하여야 하나, 이에 대한 충분한 사전검토 없이 채택하므로서 완전방수(비배수) 형식은 건설시에도 시공성이 떨어지고 기술적으로도 불합리한 요소를 지닌 채 설치되었으며, 부분방수(배수)형식은 배수관 기능저하, 배수구배 부적정 등으로 인해서 터널 구조물의 유지관리에서 누수와 수압에 의한 라이닝 콘크리트 균열, 박리 현상이 지속적으로 발생하여 보수 및 보강공사에 많은 비용이 소요되고 또한 터널 안정성 확보에 어려움이 있는 실정이다. 그러므로 터널 방수 형식에 대한 설계 및 시공 개념을 고찰함으로서 기술적인 문제점 등을 파악해서 유지관리의 개선 방향을 제안하고자 한다.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼