http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
허경욱(Kyung Wook Heo),김상준(Sang Jun Kim),박준환(Jun Hwan Park),이수인(Soo In Lee),김준수(Junsu Kim) 한국통신학회 2021 한국통신학회 학술대회논문집 Vol.2021 No.11
본 논문은 COVID-19로 인한 마스크 착용에 있어서 공공장소에서 마스크를 제대로 착용하지 않을 경우 발생하는 갈등을 방지하기 위한 인공지능 기반 마스크 탐지 시스템을 설계하고 구현한다. 이를 위해 TensorFlow를 활용하여 얼굴인식과 마스크 착용 여부를 예측하는 모델을 구현하였다.
PHIL 모의시험을 이용한 다중 컨버터로 연결된 LVDC 그리드용 Test-bed 시스템 개발
임재욱(Jae-Wook Lim),허경욱(Kyung-Wook Heo),전찬오(Chan-o Jeon),김호성(Ho-Sung Kim),정지훈(Jee-Hoon Jung) 전력전자학회 2023 전력전자학회 논문지 Vol.28 No.5
In this paper, a power hardware-in-the-loop (PHIL)-simulation-based test-bed was proposed to verify the stability and reliability of a low-voltage direct current (LVDC) grid comprising multiple converters. The test-bed comprised a source converter and a load converter with constant power load characteristics. The impedance interaction between the source and load converters was analyzed using the extra element theorem to assess the stability of the LVDC grid. Moreover, considering the non-ideal elements of the PHIL simulation system, an accurate PHIL simulation was performed to validate the stability of the LVDC grid comprising multiple converters. The effectiveness of the proposed PHIL simulation test-bed was demonstrated using a real-time simulator, an Opal-RT OP5700, a power interface, and a 0.5 kW dual-active-bridge converter. The validity of the test-bed was also verified by experiments and analysis using stability criteria.
Four-Port Dual-Active-Bridge 컨버터의 계통연계와 단독운전 시 전력 비동조화 기법
윤창우(Chang-Woo Yoon),허경욱(Kyung-Wook Heo),임재욱(Jae-Wook Lim),김호성(Ho-Sung Kim),정지훈(Jee-Hoon Jung) 전력전자학회 2023 전력전자학회 논문지 Vol.28 No.5
This study proposed a power decoupling method for a four-port dual-active-bridge (DAB) converter for grid-connected and islanding operation modes. Four-port converters based on the DAB converter have recently attr acted attention due to its capability to transfer power in a bidirectional manner and its high power density in DC microgrid systems. The four-port converter can also be connected to various distributed resources. However, this converter causes a power coupling problem where the unintended power induces poor dynamic performance and prevents the converter from effectively regulating the output voltage. Conventional four-port converters use three inductors to prevent a power coupling problem among output ports. However, this conventional method cannot transfer power when the operating mode transitions from the grid-connected mode to the islanding mode. The proposed power decoupling method for the four-port DAB converter employs a relay circuit for the coupling inductors. Using this method, the power decoupling phenomenon was mitigated in both the grid-connected and islanding modes. A 3 kW prototype four-port DAB converter was implemented to verify the validity and performance of the proposed power decoupling method.
유도 가열 시스템의 부하 임피던스 추정을 위한 Time-Split 기법
김현지(Hyun-ji Kim),허경욱(Kyung-Wook Heo),정지훈(Jee-Hoon Jung) 전력전자학회 2021 전력전자학술대회 논문집 Vol.2021 No.7
최근 유도가열기(Induction Heating; IH)는 기존 가열기에 비해 안전성이 높고 가열 속도가 우수하여 산업계와 가정 및 의료계에서 다양하게 사용된다. 이에 따라 IH 인버터 부하의 전기적 파라미터를 기반으로 부하의 상태를 파악하고 사용자 편의성을 높이는 기술들이 제안되고 있다. 또한 IH 시스템은 용기의 재질, 주파수, 온도, 용기의 상대적 위치에 따라 공진 임피던스가 변한다. 따라서 IH 시스템의 효과적인 전력 제어를 위해 실시간 부하 임피던스 추정이 요구된다. 하지만 부하 임피던스의 실시간 추정을 위해서는 고주파 공진 및 동작 주파수에 의한 높은 샘플링 주파수가 요구되고, 이로 인해 높은 성능의 ADC(Analog-to-Digital Converter)와 제어기가 필요하여 비용을 증가시킨다. 본 논문에서는 낮은 샘플링 주파수로도 실시간 임피던스 추정이 가능한 Time-Split 기법을 제안한다. 1-kW급 직렬 공진 인버터 시작품을 통해 제안하는 Time-Split 기법의 타당성을 검증하였다.