http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
양형재(Hyung Jae Yang),신웅배(Eung Bai Shin),정윤철(Yun Chul Chung),최훈근(Hun Geun Choi) 한국물환경학회 2000 한국물환경학회지 Vol.16 No.4
A bench-scale reactor using SBR process was experimented with an synthetic wastewater. The main purpose of this investigation was to evaluate applicability in the field and process removal efficiencies in terms of BOD and T-P and its corresponding kinetic parameters. Removal rate of phosphorus was 77% in terms of total phosphorus. Effluent concentrations were 9.8㎎/ℓ BOD and 1.1㎎/ℓ T-P. Effluent quality was maintained consistently stable by controlling decant volume and operating cycles. The efficiency for phosphorus removal was increased due to decrease in BOD-SS loading value in the range of 0.25≤aeration time ratio ≤0.52.