http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
서정관,유재정,이재정,양상용,정익교,Seo,Jeong-Gwan,Yu,Jae-Jeong,Lee,Jae-Jeong,Yang,Sang-Yong,Jeong,Ik-Gyo 한국조류학회(藻類) 2003 ALGAE Vol.18 No.2
The seasonal dynamics of phytoplankton and trophic state were evaluated weekly at three sites in the Lake Unmoon from May to November 2001. The seasonal succession pattern of phytoplankton community in the Lake Unmoon showed that the dominant species were; i) diatoms during the late spring, ii) dinoflagellates in June, iii) blue green algae, diatoms and dinoflagellates in July, iv) green algae and blue green algae in August, v) blue green algae in September and early November, and vi) diatoms in November. Members of Microcystis were dominant from middle August to late October and members of Aulocoseira appeared as important species in autumn in the Lake Unmoon. The concentration of chlorophyll-a ranged from 2.4 to 23.0 mg ${\cdot}m^{-3}$ (average: 8.6 mg ${\cdot}m^{-3}$) during the study period. Concentrations of total phosphorus were high during the period from July to November with the maximum of 0.028 mg ${\cdot} l^{-1}$. The average N/P ratio was 121, indicating that concentrations of phosphorus may determine the high algal biomass in the Lake Unmoon. Concentrations of silicate were higher in the Lake Unmoon (average value: 10.016 mg ${\cdot}$ l-) than in other lakes (average values: 1.074-4.408 mg ${\cdot}$ l-), suggesting high potential of diatom growth. The average trophic state index in the Lake Unmoon was 52, which was close to eutrophic state, and the trophic state trend was increasing steadily since 1999.
500MW급 표준화력발전소 시뮬레이터 모델을 이용한 디지털 제어시스템 검증
서정관,이명수,홍진혁,Suh, Jeong-Kwan,Lee, Myeong-Soo,Hong, Jin-Hyuk 한국시뮬레이션학회 2010 한국시뮬레이션학회 논문지 Vol.19 No.3
The simulator models for 500MW fossil power plant have been developed, and interconnected with the turbine control system to test and validate the digital instrumentation & control (I&C) systems before they are implemented in operating power plants. When the performance of a selected digital I&C system is tested, the corresponding simulator model is replaced by the plant digital I&C systems which is considered as a non-tunable system. The input/out variables of simulator models and control systems were mapped using the LabView in interface systems. This paper describes the interconnection method between the simulator model and the digital I&C system, and summarizes the validation test results performed at the condition of steady-state operation, normal evolution, and malfunction. The integrated validation method of digital I&C systems using the simulator models showed that the simulator can be used as a test bed for the implementation of digital I&C systems in power plants.