http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
심윤섭,변지환,황순현,전태보,Shim, Yun-Seop,Byeon, Ji-Hwan,Hwang, Soon-Hyun,Jeon, Tae-Bo 강원대학교 산업기술연구소 2011 産業技術硏究 Vol.31 No.2
Simulation plays a pivotal role in the analysis of complex systems. In this study, a job shop manufacturing system has been analyzed through DBR (Drum-buffer-rope) simulation. Specific attention has been put to examine the rate of due-date achievement. We first derived key factors affecting the system performance. We then developed ARENA simulation program based on DBR of TOC (Theory of Constraints) concepts. Based on the performance measure, factors, and experimental design, we obtained the results. We have drawn meaningful results through examination of the results. The results obtained from this study may provide a good base for practical applications.
심윤섭(Shim, Yun-Seop),변지환(Byeon, Ji-Hwan),황순현(Hwang, Soon-Hyun),전태보(Jeon, Tae-Bo) 강원대학교 산업기술연구소 2011 産業技術硏究 Vol.31 No.1
Simulation plays a pivotal role in the analysis of complex systems. In this study, a job shop manufacturing system has been analyzed through DBR (Drum-buffer-rope) simulation. Specific attention has been put to examine the rate of due-date achievement. We first derived key factors affecting the system performance. We then developed ARENA simulation program based on DBR of TOC (Theory of Constraints) concepts. Based on the performance measure, factors, and experimental design, we obtained the results. We have drawn meaningful results through examination of the results. The results obtained from this study may provide a good base for practical applications.