http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
게이트 컨택 길이에 따른 Tunneling FET 특성 분석
김재명(JaeMyeong Kim),장수혁(SooHyeok Jang),김소영(SoYoung Kim) 대한전자공학회 2017 대한전자공학회 학술대회 Vol.2017 No.6
Transistors have been modified in various ways according to the changes of the times. From vacuum tubes to today"s BJTs and MOSFETs, we have been pursuing the goal of high efficiency and high integration. But the process unit gets closer to the limitation as it scales down to nano. Therefore, the Tunneling FET (TFET) is attracting attention as a model of the new transistor. Most importantly, subthreshold Swing(SS) can be lowered below 60mV per decade, which can maximize the transistor on/off characteristics. In this study, we tried to simulate the most simple TFET by adjusting the gate contact length as a way to improve the on/off ratio and lower the SS value using Sentaurus TCAD.
신창수,박문재,최윤수,백규영,김재명,Shin, Chang Soo,Park, Moon Jae,Choi, Yun Soo,Baek, kyu Yeong,Kim, Jaemyeong 한국국토정보공사 공간정보연구원 2018 지적과 국토정보 Vol.48 No.1
국가기본도 구축은 전국을 두 권역으로 나누어 2년 주기로 항공사진에 의한 수정도화를 실시하는 정시업무와 현지조사와 준공도면 등에 의하여 주요 변화 지형지물을 2주 이내에 수정하는 수시수정업무로 이루어지며, 이 중 국가기본도 수시수정 지형자료추출 업무에 활용되는 부동산종합공부시스템(일사편리) 건물배치도의 경우 지역측지계 기반의 좌표체계로 세계측지계 기반 국가기본도에 활용할 경우 좌표변환오차가 위치오차에 포함되는 문제점을 가지고 있다. 또한 국가기본도는 수치지형도 건물 등록선인 건물 최외곽선(처마선)을 기준으로 등록하고 있고, 지적 및 건축 분야는 건물 중심선을 기준으로 등록하고 있어 건물 객체 관리기준이 불일치하고 있다. 이에 개선방법연구를 위해 부동산종합공부시스템(일사편리)건물배치도 위치에 직접 네트워크 RTK 측량을 실시하여 국가기본도 평면 도화위치 기준과 비교하여 문제점을 분석하였다. 이중 벽체와 처마의 차이가 있는 일반건축물의 경우 위치정보가 상이한 것 이외에 벽체와 처마의 차이만큼 건물 객체 비율에 차이가 있었다. 결론적으로 부동산종합공부시스템(일사편리) 건물배치도를 수시수정업무에 활용하기 위해서는 건물 중심선과 건물 최외곽선(처마선)의 이중레이어의 기초자료 제공이 필요하다 판단된다. 또한, 최신성 및 정확성을 동시에 확보 가능한 유기적인 지도갱신 프로세스에 대한 연구가 필요하다. The National Base Map construction consists of the regular correction work of dividing the whole country into two regions and carrying out the modification Plotting by aerial photographs every two years as well as the real time updating work of correcting the major change feature within two weeks by the field survey and the As-Built Drawing. In the case of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) used for real time updating work of the National base map, the coordinate transformation error is included in the positional error when applied to the National Base Map based on the World Geodetic Reference System as the coordinate system based on the Regional Geodetic Reference System. In addition, National Base Map is registered based on the outline(eaves line) of the building in the Digital Topographic Map, and the Cadastral and Architecture are registered based on the building center line. Therefore, the Building Object management standard is inconsistent. In order to investigate the improvement method, the network RTK survey was conducted directly on a location of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) and the problems were analyzed by comparing with the plane plotting position reference in National Base Map. In the case of the general structure with the difference on the Building center line and the eaves line, beside the location information was different also the difference in the ratio of the building object was different between Building center line and the eave. In conclusion, it is necessary to provide the Base data of the double layer of the Building center line and the outline of the building(eaves line) in order to utilize the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS). In addition, it is necessary to study an organic map update process that can acquire the up-to-dateness and the accuracy at the same time.