http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
수태음폐경근의 근육학적 고찰 및 심부상지전방선과의 비교
김명관 ( Myungkwan Kim ),김경민 ( Kyungmin Kim ),전주현 ( Juhyun Jeon ) 대전대학교 한의학연구소 2016 혜화의학회지 Vol.24 No.2
Objectives : This study was aimed to widen range of comprehesion about meridian muscle system through myological study of meridian muscle system and comparison with deep front arm line in anatomical train Methods : We have studied the similarity and difference between Hand Great Yin Lung Meridian Muscle System and Deep Front Line in Anatomical Train through Principles of Meridians & Acupoints, publications about myology, Anatomical trains. Results : Ⅰ. Like another advanced studies, muscular system of hand great yin showed similarity to deep front line in anatomical train. Ⅱ. It is considered that muscular system of hand great yin contains Musculus abductor pollicis brevis, Musculus extensor hallucis longus, Musculus brachioradialis, Musculus biceps brachii, Musculus subclavius, Musculus pectoralis major. Ⅲ. Comparing muscular system of hand great yin to deep front arm line in anatomical train it showed similarity to part of muscles and pathological symptoms. But it showed difference to part of muscles and pathological symptoms. Conclusions : Hand Great Yin Lung meridian muscle system showed similarity and difference to deep front arm line in anatomical train. Further studies would be needed.
김영범(Youngbum Kim),조한철(Hancheul Jo),김명관(Myungkwan Kim),김유현(Youhyun Kim) 고려대학교 보건과학연구소 2004 보건과학논집 Vol.30 No.1
Quality Assurance in the radiation therapeutic field is very important for the maintenance of the radiation therapy equipment as well as the safety of patient and therapist.<BR> Currently daily Quality Assurance study follows 26 daily Quality Assurance items according to recommendation in KFDA. But the daily Quality Assurance was hard to check various items by a restriction in time on a characteristic. In order to solve this problem, we prepared the new QA sheet for new QA equipment.<BR> We examined check time on 26 items by a conventional method over a week and measured check time which used new Quality Assurance equipment. When new equipment was used, check time was shortened, and we can include Output check measured in weekly Quality Assurance in new daily Quality Assurance sheet.<BR> If new daily Quality Assurance sheet be used, a check can do conventional daily QA including output check in 20 minutes.