This case was successfully constructed as a leakage prevention case of primary 2-arch tunnel located in Anyang, Gyungkido. The leakage of primary 2-arch tunnel was observed at middle wall of tunnel and girder of tunnel. Such a leakage of primary 2-arc...
This case was successfully constructed as a leakage prevention case of primary 2-arch tunnel located in Anyang, Gyungkido. The leakage of primary 2-arch tunnel was observed at middle wall of tunnel and girder of tunnel. Such a leakage of primary 2-arch tunnel generally occurred due to the damage of the waterproof membrane constructed on the middle wall during the blasting works of right and left tunnel after construction of the middle wall. As the leakage, icicles hanged from girder of tunnel in the winter. In such phenomenon, the risk of the traffic accident in the tunnel was high. In this case, leakage prevention works were successfully constructed using the heat insulated drainage.