1 Do-Young Ko, "VIBRATION AND STRESS ANALYSIS OF A UGS ASSEMBLY FOR THE APR1400 RVI CVAP" 한국원자력학회 44 (44): 817-824, 2012
2 D.Y. Ko, "Structural analysis of CSB and LSS for APR1400 RVI CVAP" 261 : 76-84, 2013
3 Korea Hydro, "RVI CVAP Measurement Procedure"
4 Combustion Engineering Inc., "Final Report on the Performance Evaluation of the Palo Verde Control Element Assembly Shroud" 1984
5 고두영, "Design of a Vibration and Stress Measurement System for an Advanced Power Reactor 1400 Reactor Vessel Internals Comprehensive Vibration Assessment Program" 한국원자력학회 45 (45): 249-256, 2013
6 A. Hanjung, "Comprehensive Vibration Assessment Program for YONGGWANG Generating Station Unit 4 Final Evaluation of Pre-core Hot Functional Measurement and Inspection Programs" 1995
7 U.S. Nuclear Regulatory Commission, "Comprehensive Vibration Assessment Program for Reactor Internals during Preoperational and Initial Startup Testing, Regulatory Guide 1.20, Rev.2"
8 고도영, "APR1400 원자로내부구조물 종합진동평가 측정위치 선정 기준" 한국소음진동공학회 21 (21): 708-713, 2011
9 고도영, "APR1400 원자로 내부구조물 종합진동평가프로그램용 측정센서 검토" 한국소음진동공학회 21 (21): 47-55, 2011
10 고도영, "APR1400 상부안내구조물집합체 구조해석 및 측정위치 선정" 한국소음진동공학회 23 (23): 49-55, 2013
1 Do-Young Ko, "VIBRATION AND STRESS ANALYSIS OF A UGS ASSEMBLY FOR THE APR1400 RVI CVAP" 한국원자력학회 44 (44): 817-824, 2012
2 D.Y. Ko, "Structural analysis of CSB and LSS for APR1400 RVI CVAP" 261 : 76-84, 2013
3 Korea Hydro, "RVI CVAP Measurement Procedure"
4 Combustion Engineering Inc., "Final Report on the Performance Evaluation of the Palo Verde Control Element Assembly Shroud" 1984
5 고두영, "Design of a Vibration and Stress Measurement System for an Advanced Power Reactor 1400 Reactor Vessel Internals Comprehensive Vibration Assessment Program" 한국원자력학회 45 (45): 249-256, 2013
6 A. Hanjung, "Comprehensive Vibration Assessment Program for YONGGWANG Generating Station Unit 4 Final Evaluation of Pre-core Hot Functional Measurement and Inspection Programs" 1995
7 U.S. Nuclear Regulatory Commission, "Comprehensive Vibration Assessment Program for Reactor Internals during Preoperational and Initial Startup Testing, Regulatory Guide 1.20, Rev.2"
8 고도영, "APR1400 원자로내부구조물 종합진동평가 측정위치 선정 기준" 한국소음진동공학회 21 (21): 708-713, 2011
9 고도영, "APR1400 원자로 내부구조물 종합진동평가프로그램용 측정센서 검토" 한국소음진동공학회 21 (21): 47-55, 2011
10 고도영, "APR1400 상부안내구조물집합체 구조해석 및 측정위치 선정" 한국소음진동공학회 23 (23): 49-55, 2013
11 고도영, "APR1400 내부배럴집합체 상부판 구조해석 및 측정위치" 한국소음진동공학회 22 (22): 474-479, 2012
12 Combustion Engineering Inc., "A Comprehensive Vibration Assessment Program for Palo Verde Nuclear Generating Station Unit 1 (System 80Prototype) Evaluation of Predictions and Pre-Core Hot Functional Measurement and Inspection Programs Final Report" 1985