1 Choi, J., "Work flow management and productivity control for asphalt pavement operation" CSCE 33 (33): 1039-1049, 2006
2 Daniels, G., "Techniques for manually estimating road user costs associated with construction projects" Texas Transportation Institute 1999
3 Ott, L, "Statistical methods and data analysis" Wadsworth Group 2001
4 Thomas, H. R., "Reducing variability to improve performance as a lean construction principle" ASCE 128 (128): 261-267, 2002
5 RS Means, "RS Means heary construction data"
6 최재현, "Quantifying the Effects of Interference for an Alternative Method of Construction Productivity Estimation" 대한토목학회 15 (15): 761-769, 2011
7 Huang, Y. H., "Pavement analysis and design" 1992
8 Cannon, B. R., "Method for identifying rural, urban, and interstate driving in naturalistic driving data" National Surface Transportation Safety Center for Excellence 2009
9 Apipattanavis, S., "Integrated framework for quantifying and predicting weather-related highway construction delays" ASCE 136 (136): 1160-1169, 2010
10 Howell, G., "Implementing lean construction:Reducing inflow variation" 1994
1 Choi, J., "Work flow management and productivity control for asphalt pavement operation" CSCE 33 (33): 1039-1049, 2006
2 Daniels, G., "Techniques for manually estimating road user costs associated with construction projects" Texas Transportation Institute 1999
3 Ott, L, "Statistical methods and data analysis" Wadsworth Group 2001
4 Thomas, H. R., "Reducing variability to improve performance as a lean construction principle" ASCE 128 (128): 261-267, 2002
5 RS Means, "RS Means heary construction data"
6 최재현, "Quantifying the Effects of Interference for an Alternative Method of Construction Productivity Estimation" 대한토목학회 15 (15): 761-769, 2011
7 Huang, Y. H., "Pavement analysis and design" 1992
8 Cannon, B. R., "Method for identifying rural, urban, and interstate driving in naturalistic driving data" National Surface Transportation Safety Center for Excellence 2009
9 Apipattanavis, S., "Integrated framework for quantifying and predicting weather-related highway construction delays" ASCE 136 (136): 1160-1169, 2010
10 Howell, G., "Implementing lean construction:Reducing inflow variation" 1994
11 El-Rayes, K, "Impact of rainfall on the productivity of highway construction" ASCE 127 (127): 125-131, 2001
12 United State Code, "Definitions and declartion of policy, United States Code Title 23 Code §101"
13 Alfeld, L. E., "Construction productivity" McGraw-Hill 1988
14 Dai, J.Goodrum, P. M., "Construction craft workers’ perceptions of the factors affecting their productivity" ASCE 135 (135): 217-227, 2009
15 Thomas, H. R, "Construction baseline productivity:Theory and practice" ASCE 125 (125): 295-303, 1999
16 Gulezian, R, "Baseline determination in construction labor productivity-loss claim" ASCE 19 (19): 160-165, 2003
17 Minchin, R. E., "An economic evaluation based on total cost of aggregate base vs. asphalt base in the FDOT road construction operation" Florida Department of Transportation 2003
18 Damrianant, J., "An alternative approach for modeling of interference in discrete-event systems" ASCE 17 (17): 213-235, 2000
19 Finke, M. R, "A better way to estimate and mitigate disruption" ASCE 124 (124): 490-497, 1998