건축턴키공사 입찰·계약 단계에서의 클레임 예방을 위한 클레임요인 분석 및 대응방안에 관한 연구 : 국내대형건축턴키공사 사례중심으로
윤준선,백준홍 韓國仲裁學會 2004 중재연구 Vol.13 No.2
In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.
윤준선,유병억 한국건축시공학회 2006 한국건축시공학회지 Vol.6 No.2
Among national properties of various governmental offices and departments, we focused on the public finance. Because the financial balance of national properties of governmental offices and departments has been in deficit.This study focuses on postal administration business which faces the financial crisis. The purpose of our study is to show devices for value improvement of postal administration business headquarters of Ministry of Information and Communication. Research was based on case researches and domestic post offices which were decided to rebuild. Problems of domestic postal administration business were first found out. And for its solutions, research on domestic and foreign cases were carried out, superior cases for benchmarking was regulated so that these can be applied to the post offices to be built or to be remodeled.
Double-stranded RNA(dsRNA)를 이용한 해충방제의 현황과 미래
윤준선,지창윤,성건묵,최만연 한국응용곤충학회 2022 한국응용곤충학회지 Vol.61 No.1
지난 10년 동안, 이중 가닥 RNA (double-stranded RNA, dsRNA)를 이용한 특정 유전자 발현 간섭(RNA interference, RNAi) 기술은 의약품 개발뿐만 아니라 작물보호 분야에 해충방제부터 익충보호까지 다양하게 그 기술이 사용되어 왔다. 그동안 학계 및 산업체에서 활발히 연구되어 온 RNAi기술을 이용한 작물 및 익충보호제는 상용화를 눈앞에 두고 있다. 미래 농업 시장에서 해충방제제와 익충보호제로써의 개발을 위한 RNAi의 기술적 응용은 상당한 잠재력을 가지고 있지만, 현장에 직접 사용되기에는 아직 여러 가지 한계점이나 극복해야 할 과제가 남아있다. 본 리뷰에서는 최근에 활발히 진행되고 있는 작물보호제 및 익충보호제(protection of crops and beneficial insects)로써의 dsRNA의 다양한 활용과 그 잠재성(potential)을 소개하고자 한다.
건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구 : 턴키공사 사례 중심으로 Focusing on Turn-Key Project
윤준선,서춘택 韓國仲裁學會 2005 중재연구 Vol.15 No.1
In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.
건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구- 국내공사 사례중심으로 -
윤준선,유병억 한국건축시공학회 2006 한국건축시공학회지 Vol.6 No.1
In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.
건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 : 클레임예방을 중심으로 Focused on Preventing Claim
윤준선 韓國仲裁學會 2005 중재연구 Vol.15 No.3
Turnkey project in construction which accounts for about 10% of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.